Equiptment Instalations

Pre planning the equipment layout at the start of any pool build is crucial to many contributing factors. Often the space allowed for by architects is not sufficient or may not work to regulations such as gas heater flues/clearances sewage connections… etc.. Its very important to not only configure the proposed equipment layout and preferred pipe run path to get there but also making sure that the pipe run and stand pipes are done as soon as possible straight after the shell construction. Sometimes its even done prior to shell construction depending on the site works schedule.